Aleithawe, I, Sinno, R R and McAnally, W H (2012) Right-of-Way Acquisition Duration Prediction Model for Highway Construction Projects. Journal of Construction Engineering and Management, 138(04), 540–4.

Ashuri, B, Kashani, H, Molenaar, K R, Lee, S and Lu, J (2012) Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options. Journal of Construction Engineering and Management, 138(04), 545–57.

Chen, Q and Jin, R (2012) Safety4Site Commitment to Enhance Jobsite Safety Management and Performance. Journal of Construction Engineering and Management, 138(04), 509–19.

Dyer, B, Goodrum, P M and Viele, K (2012) Effects of Omitted Variable Bias on Construction Real Output and Its Implications on Productivity Trends in the United States. Journal of Construction Engineering and Management, 138(04), 558–66.

Fortunato, B R, Hallowell, M R, Behm, M and Dewlaney, K (2012) Identification of Safety Risks for High-Performance Sustainable Construction Projects. Journal of Construction Engineering and Management, 138(04), 499–508.

Hwang, B and Ho, J W (2012) Front-End Planning Implementation in Singapore: Status, Importance, and Impact. Journal of Construction Engineering and Management, 138(04), 567–73.

Kog, Y C and Loh, P K (2012) Critical Success Factors for Different Components of Construction Projects. Journal of Construction Engineering and Management, 138(04), 520–8.

  • Type: Journal Article
  • Keywords: Project management; Construction management; Engineering profession; Critical success factors; Project objectives; Construction professionals; Analytical hierarchy process;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000464
  • Abstract:
    The present study attempts to distinguish the different critical success factors (CSFs) for different components of construction projects as perceived by different professions, i.e., civil and structural engineers, mechanical and electrical engineers, architects, and quantity surveyors. An analytical hierarchy process (AHP) is adopted to solicit the consistent subjective judgment of 27 experts in construction to identify the top 10 CSFs from 67 factors describing aspects of project characteristics, contractual arrangements, project participants, and interactive processes. The views of the different professionals are shaped by the experience they gained from their involvement in the respective components of the construction projects under their charge. It follows that the CSFs identified by the professionals are naturally relevant to the components of construction projects that they are familiar with. The present study reveals that the respective top 10 CSFs for the schedule, budget, and quality performance of architectural works, civil and structural works, and mechanical and electrical engineering works are markedly different. Moreover, the study shows that the judgment with regard to CSFs of respondents with less than 15 years of experience differs from that of the more experienced respondents and hence may not be good enough. It follows that studies reported in the existing literature that have included views of respondents with less than 15 years' experience in construction or based on the views of professionals predominantly from a particular discipline are likely to be biased and misleading.

Li, X and Chen, X (2012) Using Grouting of Shield Tunneling to Reduce Settlements of Overlying Tunnels: Case Study in Shenzhen Metro Construction. Journal of Construction Engineering and Management, 138(04), 574–84.

Orabi, W and El-Rayes, K (2012) Optimizing the Rehabilitation Efforts of Aging Transportation Networks. Journal of Construction Engineering and Management, 138(04), 529–39.

Rahman, M M and Kumaraswamy, M M (2012) Multicountry Perspectives of Relational Contracting and Integrated Project Teams. Journal of Construction Engineering and Management, 138(04), 469–80.

Wambeke, B W, Liu, M and Hsiang, S M (2012) Using Last Planner and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks. Journal of Construction Engineering and Management, 138(04), 491–8.

Woldesenbet, A, Jeong, & H S and Oberlender, G D (2012) Daily Work Reports–Based Production Rate Estimation for Highway Projects. Journal of Construction Engineering and Management, 138(04), 481–90.